Accelerator operation
The Operation Group consists of 15 operators and assistant operators and is headed by the Group Manager, Stephen Molloy, who also works as an operator. We are responsible for delivering a stable high-quality beam to the users. This means operating and controlling the accelerator complex consisting of the 3 GeV linac, the 1.5 GeV storage ring and the 3 GeV storage ring. We work to constantly improve beam availability, beam quality and operation in general.
Operation Links
- Machine status
- Commissioning schedule (internal only)
- ELOG (internal only)
- Machine operation schedule
- Commissioning and first‐year operational results of the MAX IV 3 GeV ring
- Machine statistics (to be added)
Contact info: Stephen Molloy